210344 HTP 6 TI - Imperial Dade

Tenant Upgrades to Shell Building

Status

Bidding Closed

Bid Date12/22/21 5:00pm

Company & Contacts

BEX Construction Services

Nike Ellis, nick@bexstl.com  

Location

1555 Tradeport Dr Suite 100

“The scope of construction work to be furnished by the Contractor shall include all
necessary construction of facilities as generally depicted on the attached exhibits. The
office shall be constructed with full coverage fire suppression system, as well as complete
mechanical, electrical, and plumbing systems.

The scope of design work to be furnished by the Contractor shall include: - Mechanical design - Plumbing design - Electrical design - Fire protection design - Structural frame modifications, as necessary The scope of design work to be furnished by the Developer shall include: - Architectural design - Structural design (if required)

Contractor shall be responsible for coordinating all design and construction work within
their scope with design and construction work being furnished by the Developer. “